Cold weather is a good reason to review a pump system before an outage makes the decisions for you. For commercial properties in Oregon and Washington, a useful winter check is not simply “Does the pump run?” It is whether the equipment, exposed piping, controls, and response plan are ready for the conditions at that particular site.

This checklist is for planning and safe observations by property teams. Pump servicing, electrical work, pressure release, and winter shutdown or restart should be handled by qualified personnel using the equipment manufacturer's instructions and the site's safety procedures.

1. Identify what must stay in service

Make a short list of the pumps your building relies on: domestic-water boosters, heating circulators, sump pumps, sewage ejectors, or other process equipment. Note the location, equipment model, duty, backup arrangement, and who should receive an alarm. Do not assume a standby pump has been tested just because the primary pump is running.

Separate equipment that must operate through winter from equipment with an approved seasonal shutdown. A winterization procedure for an idle pump is not a reason to drain or disable an essential system. Fire-protection equipment requires its own qualified service and impairment procedures, not this general checklist.

2. Review exposure, not just outdoor temperature

Walk the accessible areas around pump rooms and exposed pipework. Record damaged enclosure panels, weather seals, insulation, signs of water entry, or an unheated space that needs attention. Include small connecting lines and instruments in the review rather than looking only at the main pump casing.

Ask a qualified service provider to confirm that the installed weather and freeze-protection arrangements suit the equipment and location. Insulation does not generate heat, and a cover must not obstruct required motor cooling or maintenance access. Do not add improvised heaters, alter electrical wiring, or wrap motors without checking the manufacturer's requirements.

3. Put seasonal shutdowns on a written plan

Water left inside idle equipment can be a freezing risk. For example, the Xylem Series e-1510 manual specifically calls for draining liquid from an idle pump exposed to freezing. The correct method depends on the actual pump and connected system; a single accessible drain does not prove every trapped section is empty.

Have the responsible technician document the approved isolation, draining or other protection procedure, equipment status, and restart requirements. Do not loosen plugs or fittings on a hot or pressurized system, and do not add antifreeze to potable-water or other systems as a generic winter fix.

4. Check alarms and backup arrangements before bad weather

Review recent alarm history, unexplained trips, unusual run times, leakage, vibration, and pressure complaints. Arrange functional checks of duty/standby operation and alarm notification using the site's approved procedure. A light on a panel is not a substitute for confirming that the right person receives the notification.

For drainage and sewage equipment, report damaged covers, recurring high-water alarms, or changes in pump cycling. Do not enter a wet well, reach into a basin, open energized controls, or deliberately raise a liquid level to test an alarm. Those checks belong to trained personnel with the appropriate safety controls.

5. Plan the restart as carefully as the shutdown

After a freeze, outage, or long idle period, avoid repeatedly resetting a pump that will not run normally. Record the fault and arrange inspection. Manufacturer startup guidance may require checking for damage, restoring liquid and prime, and completing other model-specific steps before operation. A successful motor start alone does not verify proper flow or system condition.

What to send with a service request

  • Site address, access arrangements, and a reachable contact.
  • Pump and motor nameplate photos taken from a safe location.
  • Whether the equipment is running, stopped, or repeatedly tripping.
  • Alarm wording, pressure or flow observations, and when the symptom began.
  • Recent service, electrical work, shutdowns, or suspected freeze exposure.

RMS Pump provides pump troubleshooting, repair, maintenance, and controls support throughout Oregon and Washington. Request service for an existing equipment issue, or call (503) 665-8101 to discuss an urgent problem. For planned equipment changes or a new system, use Contact Sales.

Manufacturer references

These references illustrate why model-specific instructions matter; they do not replace the manual for your installed equipment.